This luminaire is designed for pendant or ceiling mounting applications and should be
installed and maintained according to the following recommendations.

This luminaire has been properly packed so that no parts should have been damaged
during transit. Inspect to conrm.
The carton should contain a luminaire complete with mounting assembly and the lamp
installed in the socket (medium base version only).

 
1. Loosen three refractor ring screws and remove refractor and refractor ring from
luminaire housing.
2. Loosen reector screws, rotate and remove reector. Remove nomex wire shield.
Note: Nomex shield may be discarded if 105°C, or above, wiring is used.
3. Thread pendant/conduit into top housing (Figure 4) or mounting hub (Figure 6),
and tighten lock nut.
4. Feed wires through pendant and extend approximately 6 inches of wire into
housing and make necessary connections. (See Wiring section) Connect supply
ground lead to the luminaire green lead.


 Follow installation instructions


 Turn power o before servicing
see instructions
 
Mounting
Plate
Junction
Box
Locking
Screw
Wire
Clip







If unit is multi-volt, see Wiring Section below.

 
1. Attach mounting plate to electrical junction box and pull incoming power leads
through oval hole in mounting plate.
2. Suspend luminaire below j-box and attach wireform by squeezing legs together
slightly and inserting through rectangular j-box mounting plate holes.
3. With luminaire hanging below j-box make electrical connections and place wires
into j-box. (Figure 1)
4. Swing luminaire into place, mate two mounting plates and slide together until
plates lock into place. (Figure 2)
5. To remove xture from j-box, luminaire must be opened, by loosening three refractor
ring screws, then loosening reector screws, rotating and removing reector. The
locking screw must be backed out approximately one-half inch. (Figure 3)

Locknut
(By User)
Cover
6 Inches
(152mm)

Cover
Connectors
Wire Clip
Ground Lead
To
Ballast
Mounting
Plates
Wireform
g
GE
Lighting Solutions
These instructions do not purport to cover all details or variations in equipment nor to provide for every possible contingency to be met in connection with installation, operation or
maintenance. Should further information be desired or should particular problems arise which are not covered suciently for the purchaser’s purposes, the matter should be referred to
GE Lighting Solutions.
Vista de pagina 0
1 2

Indice de contenidos

Pagina 1 - 

This luminaire is designed for pendant or ceiling mounting applications and should be installed and maintaine

Pagina 2

5. Route incoming supply conductors through wire clip (D, Figure 5) provided. Re-attach nomex shield.6. Reassemble luminaire. 