GE ABV1 Guía de instalación Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 4
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
1
3 4
2
Loosen screws to remove power access plate.
Connect AC line to xture’s power supply using the
supplied UL listed wire connectors. Green to green
(ground), red to red (line) and black to black (neutral).
If supplied with a factory installed cable connect
green to green (ground), red to black (line) and black
to white (neutral).
Place all connections and exposed wire inside of xture
and reattach power access plate.
A) Install 1/2” conduit, or B) install AC power cord with
strain relief into power access plate.
A) Conduit B) Power cord
Electrical Connections (347/480V)
Optional Mounting Methods
1 2
Determine rod spacing based on the above table.
Secure 1/2” threaded rods into structural members
in ceiling. Place a nut on each threaded rod where
xture should hang. Slide rod mount brackets onto
threaded rods and tighten second nut onto rods to
secure xture.
Lift xture up to installed rod mount brackets until they
snap onto mounting features. Let the xture hang and
install (4) 8-32 x 3/8” screws into rod mount brackets.
Do not over tighten screws.
Rod Mount Kit
OPTION A
Attach to
structural member
Fasten with nuts
ABV1-series LED Modules Rod Mount Spacing (in.)
1 ≤ 11.5”
2 26.5”
A) Conduit B) Power cord
Vista de pagina 2
1 2 3 4

Comentarios a estos manuales

Sin comentarios