GE ALC4 Guía de instalación Pagina 4

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 6
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 3
3 4
Option: power input from side – Remove knockout in
endcap and A) Install 1/2” conduit, or B) install AC power
cord with strain relief. Plug unused hole on top with
appropriate tting.
120-277V: Connect the green (ground), black (line)
and white (neutral) wires of the AC line to the similarly
colored wires of the xture’s power supply using UL
listed wire connectors. Re-attach endcap.
347-480V: Connect the green (ground), red (line) and
black (neutral) wires of the AC line to the similarly
colored wires of the xture’s power supply using UL
listed wire connectors. Re-attach endcap.
1 2
Loosen screws to remove endcap. Option: power input from top – Remove knockout in top
and A) install 1/2” conduit, or B) install AC power cord
with strain relief.
A) Conduit B) Power cord
Electrical Connections
Note: Please see additional wiring instructions if installing multiple xtures in a Continuous Run or an inline Control Module.
A) Conduit B) Power cord
3 4
Close xture and tighten screws. Connect AC wires from
junction box to xture wires (see Step 4 under Electrical
Connections for details).
Mount xture to junction box.
Junction box
in ceiling
Vista de pagina 3
1 2 3 4 5 6

Comentarios a estos manuales

Sin comentarios